Emergency K-House Camp Completed in 30 Days

30-Day Emergency K-House Accommodation Camp

Project Type: Emergency Accommodation Camp
Building System: Prefabricated K-House
Project Year: 2022
Construction Period: 30 Days

Application: Worker Accommodation and Supporting Facilities.
Project Background
In 2022, during the COVID-19 pandemic, this project required a large-scale temporary accommodation camp to be delivered within an exceptionally short timeframe. The facility needed to provide safe and functional living spaces, together with offices, dining areas, bathrooms, storage rooms, and other essential site services.
Our Solution
ZCS supplied a complete prefabricated K-House solution covering camp planning, building design, component production, delivery coordination, and installation support. The camp consisted of multiple two-storey buildings manufactured with standardized light-steel structures and insulated sandwich panels. Factory prefabrication and simultaneous on-site assembly allowed several buildings to be constructed at the same time, significantly accelerating the overall schedule.
Project Result
The complete accommodation camp was delivered in approximately 30 days, demonstrating the speed, scalability, and cost efficiency of the K-House system. Its flexible modular design also allowed different functions to be integrated and future buildings to be added when required. This solution is well suited to construction camps, mining camps, infrastructure projects, worker dormitories, temporary offices, and emergency accommodation facilities.